Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)

$31.44
Skip to product information
Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)
Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)
$31.44

About This

  • This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans.
  • NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywhere. iOS & Android app.
  • ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.
  • SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.
  • LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.

Overview

  • Brand : PETLOC8
  • Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
  • Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
  • Supported Application : iOS, Android
  • Specific Uses For Product : Pet Monitoring - Cats

You may also like